Product information

GDS Gas Central installation complete set for 1 Acetylene + 1 Oxygen cylinder system

Features

  • Includes all items necessary for the gas central room, including signs, racks, equipment and brackets to be screwed or welded to deck and bulkhead
  • Included are also pre-welded unions to be welded to the distribution pipes, and brazed to the evacuation pipes from the regulator safety valves
  • Gas cylinders, cylinder trolley, clamps, bushings and outlet stations should be ordered separately in necessary quantities
  • If the central is to be placed in two separate rooms, one each for Acetylene and Oxygen respectively, one each of signs product no. 183202, 526566 and 526558 and an additional cylinder rack product no. 320358 are needed.

Benefits

  • Increases safety
  • Cylinders are less subject to physical damage
  • Location of cylinders is known to everyone onboard
  • Cylinders can easily be removed in case of fire onboard
  • No cylinder transport to the worksite needed

Specification

Documents