Search page
We found 6398 search results.
Narrow the search result by using the filters.
You can also find relevant contacts and locations here
Showing 4771-4780 of 6398 search results-
Product
Post departure follow up
We perform thorough follow-up with information and communication with regards to cost and disbursement accounts.
-
Product
Well Drilling, Iraq
Mobilization of rigs with camp from Kuwait to Iraq with over 130 trucks dispatched.
-
Product
Oil & Gas, Qatar
Plant expansion - 147,000 tons of cargo transported in gas-debottle necking project.
-
Product
Transporting Generators, Norway
Moving generator “made to fit” a tunnel 500 meters inside a mountain. Total of 40 parcels with the heaviest weighing 80 tons.
-
Product
Power Plant, Mew-Kuwait
Handling of Gas Turbines and Generators ranging from 234 tons to 279 tons as well as cross loading onto receivers trailers.
-
Product
Step 4: Demobilisation
Plans to dispose assets, redeploy or dismiss personnel and possibly reinstate premises to their pre-project condition are created and executed.
-
Product
Step 3: Execution
Operations begin. Monitor and control processes are implemented to manage time, cost, quality, change, risks and issues, as well as procurement and communication.
-
Product
Step 2: Mobilisation
Materials and equipment are incorporated into the project and arrangements for personnel and other essential resources are organised.
-
Product
Step 1: Planning
Options are identified and screened based on your requirements. A solution is selected, a concept developed and a preliminary plan developed.
-
Central Europe safety systems contacts
Germany, Greenland, Luxembourg, Netherlands, Poland, Slovakia, Switzerland Sales Manager, Central & Eastern Europe Holger Jablonski Email: holger.jablonski@wilhelmsen.com Phone: +49 151 182 16 587 Germany office address Hansestrasse 20 DE-27419 Sittensen